In 2025, Tenfly worked with a local system integrator in the Philippines supplying monitors for public schools.
The project focused on large-volume deployment with long daily usage and high stability requirements.
Project Requirements
The client emphasized several key points:
- Usage: Classroom environment, 6–10 hours daily operation
- Stability: Reliable performance with low failure rate
- Power: Ability to handle unstable local voltage conditions
- Interfaces: Basic compatibility with teaching equipment
- Budget: Cost-effective within project constraints
Key Challenges
Based on the local environment, Tenfly identified several risks:
- Unstable voltage could affect monitor power modules
- Long operating hours required higher internal stability
- Equipment needed to be durable in relatively rough usage conditions
Project Solution
1.Optimized the power supply design to better handle voltage fluctuations.
2.Improved internal structure and mainboard stability for long-hour operation.
3.Enhanced the cooling design to ensure consistent performance over time.
4.Kept a practical interface configuration for education use compatibility.

Project Results
The project was delivered in multiple batches, totaling 2,000+ units across different schools.
- Stable operation during long daily usage
- Reduced maintenance pressure for schools
- The client placed additional repeat orders after initial deployment