In 2025, Tenfly worked with a local system integrator in the Philippines supplying monitors for public schools.
The project focused on large-volume deployment with long daily usage and high stability requirements.

Project Requirements

The client emphasized several key points:

  • Usage: Classroom environment, 6–10 hours daily operation 
  • Stability: Reliable performance with low failure rate
  • Power: Ability to handle unstable local voltage conditions
  • Interfaces: Basic compatibility with teaching equipment
  • Budget: Cost-effective within project constraints

Key Challenges

Based on the local environment, Tenfly identified several risks:

  • Unstable voltage could affect monitor power modules
  • Long operating hours required higher internal stability
  • Equipment needed to be durable in relatively rough usage conditions

Project Solution

1.Optimized the power supply design to better handle voltage fluctuations.

2.Improved internal structure and mainboard stability for long-hour operation.

3.Enhanced the cooling design to ensure consistent performance over time.

4.Kept a practical interface configuration for education use compatibility.

Project Results

The project was delivered in multiple batches, totaling 2,000+ units across different schools.

  • Stable operation during long daily usage
  • Reduced maintenance pressure for schools
  • The client placed additional repeat orders after initial deployment